Ground-based inerting or GBI involves fuel tank inerting on the ground only. This
provides protection during ground operations and during the initial phases of flight
where the exposure of the fuel tank to flammable vapors is usually greatest. It
consists of displacing most of the oxygen dissolved in the fuel with nitrogen by a
process called fuel scrubbing. It also requires displacing the air in the fuel tank
empty space, also known as ullage, with nitrogen enriched air (NEA) in a process
called ullage washing. GBI could be accomplished by ground-based equipment, that
resides at the airport, which would allow for increased cost effectiveness of the
process with minimal impact on the airplane. The purpose of this research effort
was to more accurately quantify the cost of implementing GBI for all US flights
carrying more than 19 passengers. The cost of implementing GBI only for airplanes
with heated center wing tanks (HCWTs) was also determined. Airplanes that have
the air conditioning equipment, or packs, located below the center wing fuel tanks
are considered to have heated center wing tanks. This analysis considered the cost
of GBI over 10 years, with a 3-year start up period. The cost of modifying the airplane
to allow for GBI was not considered in this analysis.
To determine the cost of GBI, an industry team was assembled, lead by an FAA representative.
The team possessed expertise in airports and aircraft ground operations, and
state-of-the-art hollow fiber membrane (HFM) nitrogen generation technology.
The cost of implementing GBI at Atlanta Hartsfield International Airport (ATL) and
Atlantic City International Airport (ACY) were first determined. Using DOT and FAA
data, the cost was then extrapolating to all US airports that operate airplane that
carry more then 19 passengers.
The results of the cost analysis indicated that the cost of GBI for all flights over
19 passengers, at the nation's 400 largest airports would be approximately 1.6 billion
dollars. The cost of GBI for all airplanes with heated center wing tanks, which did
not include fuel scrubbing with nitrogen, was determined to be approximately 800 million
dollars. For the purpose of this study, aircraft with HCWTs were considered to be all
Boeing airplane models manufactured in Boeing's facilities in the Seattle, Washington
area (that is, not including the models manufactured in Long Beach, California) and
all Airbus airplanes. Nonrecurring costs accounted for 37% of the cost of GBI for all
US departures over 19 seats and 50% of the cost of GBI for HCWTs only. Labor accounted
for 46% of the total cost of GBI for total applicable departures and 37% of the cost
for inerting HCWT departures only. The cost of nitrogen for all applicable departures
and HCWT departures only was 14% and 10% of the total cost, respectively.
|